FMS have recently completed a turnkey installation in France for an aluminium foundry
FMS were approached via our agent Brefond following the bankruptcy of a well known equipment supplier meaning the project had been stopped.
FMS were asked to take on the project on a turnkey basis as the customer did not have the time or resources to assist with the project management due to their demand for production at the present time.
Following several site surveys and meetings the FMS team took complete control of the project from design, manufacture, delivery, installation and commissioning.
The total project scope of supply included:-
- 80 tonne capacity reclaimed sand silo
- HPG 1000kg/hour thermal reclamation plant
- Silo level and monitoring for 4 x existing sand silos
- Maintenance alarm system with SMS messaging to key personnel
- Adiabatic water cooling tower complete with a customer support structure and access platform
- T6 (6tph) reclaimed sand classifier
- 2 x Reverse jet dust extraction plants (thermal and sand classifier)
- 2 x Custom sand gates with PLC controlled motorised linear actuators for existing sand mixers to allow multiple sand recipes at the operator stations
- Internal sand silo for existing sand mixer
- Pulsor PC2 pneumatic conveyor
- Complete set of conveying pipework and associated anti-wear bends throughout the foundry